Embark Laboratories

About The Project

Design & Build

Client Embark Laboratories

Industry Biotech

Location Tai Seng Link

Floor Size 3,600sqft

Year 2025

Image -83.jpg

Working 6m Above Ground: 

Insights for Industrial Offices

We had the privilege of partnering with Embark Labs to design and build their new office space. Like many industrial offices, the project presented both opportunities and challenges. The high ceilings allowed us to create a design that emphasized openness, flexibility, and scale. At the same time, the build demanded unique construction solutions that went beyond the requirements of a conventional office.

Image -73.jpg
Image -82.jpg
Image -57.jpg
Image -65.jpg

Structural Reinforcement for Partitions

With ceiling heights up to 6.3m, drywall partitions alone are not sufficient to remain stable. Additional metal structural supports were required to ensure durability and safety. This structural reinforcement provided the necessary backbone for the partitions, preventing warping or instability over time.

Elevated Access and Safety

Working at 6.3m ceiling height required scissor lifts, scaffolding, and work-at-height certified MKS workers. Safety was our top priority, with daily briefings held each morning before elevated installations such as drywall, ceiling and electrical works began.

WhatsApp Image 2025-03-24 at 7.11.26 PM.jpeg
WhatsApp Image 2025-03-24 at 7.11.25 PM.jpeg

Before (Site Photo)  

Image -66.jpg

After (Site Photo)  

WhatsApp Image 2025-03-24 at 7.11.23 PM.jpeg

Before (Site Photo)  

Image -61.jpg

After (Site Photo)  

Image -62.jpg
Image -68.jpg
WhatsApp Image 2025-03-24 at 7.11.24 PM (2).jpeg

Managing Last-Minute Requests

Towards the end of the project, the client requested roller blinds for the windows. While this addition enhanced both comfort and usability, it required additional coordination. To accommodate scissor lifts, all workstations had to be carefully dismantled, moved, and later reinstalled once the ceiling pelmets and blinds were completed. These late changes added cost and time, but with proper planning we ensured the work was delivered smoothly.

Image -85.jpg

Key notes for future industrial office projects:

  • Plan for high ceilings – include structural supports early.

  • Prioritize safety – use proper equipment and certified workers.

  • Stay flexible – allow budget and schedule room for changes.

All in all, it was a great opportunity to work with Embark Labs. Together, we delivered a workspace that is open, functional and safe.

Sign up for our newsletter

Thanks for submitting!

Contact

Address

Social

Call

Email

6334 7880

9856 7422 

(whatsapp only)

sales@

mksingapore.com

1 Maritime Square,

HarbourFront Centre

#12-05

Singapore 099253

© 2023 by MKS Global Pte Ltd

Go up

bottom of page